
|
|||||||||
TEXT:
Mikado construction >>Gudensberg<<
Order-No.: 1.0020-EM
posts made of stainless steel
wood: robinia
+ 1 octagon tower with 8 radial inclined posts made of stainless steel, segmentally lacquered in Mikado-design
++ 1 octagon platform with opening, PH 250cm
++ 1 spire roof made of HPL (optional standard colour assortment) with stainless steel cap
++ 3 pressure support posts made of stainless steel
++ 1 net tunnel made of hercules rope
++ 1 safety barrier made of stainless steel
++ 1 climbing wall with step through frame with climbing grips made of synthetic resin
++ 1 ladder with stainless steel bars
++ 1 Spiel-Bau slide, box shaped, made of stainless steel
+ 1 horizontal net 200x300cm with 4 horizontal ropes
++ 2 ropes between two posts
+ several balustrades and railings
+ 1 rope labyrinth
++ 1 hammock
++ small heap of logs
Made in Germany!
All support posts made of stainless steel tube ø101,6mm, segmental lacquered in design of Mikado.
All wooden parts made of Robinia, planed and chamfered. All wooden parts are untreated.
Visible ends of the posts are welded conclusively to a stainless steel cap.
All stainless steel surfaces are radiated with glass marbles according to environmental protection rules.
Connection between platform/railing and support posts through stainless steel press-in threaded sleeves.
Platform fixed by use of concentrical incorporated stainless steel brackets.
Connection point net/rope with support posts through specifically formed stainless steel fork and tensible stainless steel chain.
Nets made of Hercules rope.
All connecting parts made of stainless steel or galvanized. Use of self-locking nuts only.
Drying cracks are normal in all native hard woods, also after appropriate storage and professional treatment. There for drying cracks do not justify a warranty claim. (cf supplementary sheet to the German Institute for Standardization EN 1176, Note on 4.2.7.6)
Spiel-Bau GmbH
Alte Weinberge 21
14776 Brandenburg an der Havel
FON: 03381 26140
FAX: 03381 261418